📊 Basic Specifications
Model NO.:MB-01
Range of Applications:Industrial
Type:Electric Holding Furnace
Usage:Glass
Fuel:Gas / Natural Gas
Kiln Type:Full Thermal Preservation Horseshoe Flame
Melting Area:18 M2
Melting Capacity:32-36 Ton/Day
Flame Temp:1500-1580℃
Consumption:1900-2200 Kcal/Kg
Charging Way:Double Sides Charging
🛠️ Product Description
| No. |
Product Information |
| 1 | Masonry parts (various refractory materials) |
| 2 | Steel structure parts, stainless steel material warehouse, hopper and water quenching system. |
| 3 | Temperature control, the manual / automatic control air exchanging system |
| 4 | Front mixing, storage and feeding system of melt block kiln |
| 5 | Combustion system and feeder, fan, hardware, auxiliary materials, etc |
| 6 | Construction and installation cost |
⚙️ Technical Data for Kiln
| Item |
Design Data |
| Kiln Type | Full thermal preservation type horseshoe flame melt kiln |
| Melting Area | 18 m2 |
| Melting Tack Size | 6.08×3.1×0.675 m |
| Melting Capacity | 32-36 ton/day |
| Electric Consumption | 70 KW |
| Forming Type | Set up the material tank double-flow stock self-flow |
| Inner Construction | Top part Al2O3>65% high alumina bricks, Siemens lattice body (560 m2 exchange area) |
| Melting Tank | 33# fused zirconia bricks |
📋 Civil Work and Support Requirements
- Foundation work and construction of settlement room.
- Installation of chimney, dust collect, and desulfurization systems.
- Supply of foundation materials (Red brick, cement, sand).
- Electrical supply: 50HZ+1, 380/220V+5%.
- Natural gas supply: Low heating value ≥ 8500Kcal/Nm3.
- Atomized compressed air: 0.55-0.6Mpa pressure.
🖼️ Project Gallery
❓ Frequently Asked Questions
What is the typical delivery time for orders?
Machines and molds orders generally take 30 working days after the pre-payment is received.
What kind of packaging is used for shipment?
Machines are packed using standard wooden cases or PE film wrapping to ensure safety during transit.
What are the available payment terms?
We accept various payment methods including L/C, T/T, DP, and DA.
How long is the product warranty?
The warranty period for machines is 12 months starting from the date of installation and commissioning.
How is after-sales service handled?
We provide rapid response support. If replacement parts are required, they are typically dispatched via international courier within 48 hours.
Do you offer installation and commissioning support?
Yes, engineers are available to travel to your site for machine installation and commissioning assistance.