1 / 5
Organic fertilizer raw materials:
| Fermentation Process | Controlled fermentation (20-25 days) where materials reach 60°C. Turning ensures oxygen exposure and moisture reduction. Finished when temp stabilizes at 50°C. |
| Forklift Feeder | Equipped with frequency converter and anti-blocking devices to store and deliver fermented materials quantitatively. |
| Crushing Process | Vertical crusher reduces materials to powder (>40 mesh) with moisture controlled below 40%. |
| Screening Process | Rotary screening (3-5mm mesh) to separate finished powder from large lumpy materials. Includes anti-blocking devices. |
| Packaging Process | Quantitative packing (20-50 kg) with options for automatic folding, sewing, and cutting. |
Pre-sale Service: Technical consultation, customized scheme design, and free CAD factory layout designs.
After-sales Service: On-site installation, engineer dispatch for debugging, operator training, and life-long maintenance support.