Bamboo Plywood Peri Dock for Eco-Friendly and Durable Solutions

Customization: Available
After-sales Service: Quality Warranty
Warranty: One Year

Product Description

📋 Basic Info.
Model NO.
GF-001
Certification
ISO, CE
Material
Steel
Type
Slab Formwork
Panel Material
High Tensile Steel Sheet
Plywood Material
Bamboo
Color
Green or Customized
Specification
1800x1200mm
Origin
China
HS Code
8480600000
🏗️ Product Description

Introducing the Green Formwork Table Form: An Eco-Conscious Building Material for Sustainable Construction Projects

Green Formwork is the ultimate solution for perfect slab formwork in flatslab or beam-less structure projects. It features an advanced aluminum/steel panel prop formwork system designed for early stripping operations, ensuring efficiency and robustness.

Ingeniously Simple & Innovative:

Minimal components required: Steel frames and eco-friendly bamboo plywood
Prop with effortless quick release
Eliminates the need for cross braces and tripods
Simplifies horizontal and vertical transfers

Fast & Efficient:

Requires just a 3-4 person team for installation, stripping, and removal
Achieve an impressive 60-80m² of construction work per person per day

Safe & Reliable:

Boasts a stable system with a six-directional locking mechanism
Designed to eliminate the need for lifting above shoulder height
🔧 Installation & Project Case
🏭 Technical Expertise

Our manufacturing facilities feature state-of-the-art forging, casting, punching, welding, cold forming, and surface treatment. Products are crafted to perfection adhering to international standards such as BS1139 and EN74/EN74B.

Our patented Green Formwork system, utilizing Canadian "TABLA" technology, features a unique drop-head mechanism. It is acclaimed globally as one of the most advanced, safest, and fastest slab formwork systems available.

FAQ
What makes Green Formwork eco-friendly?
The system utilizes sustainable bamboo plywood and reusable steel frames, reducing waste compared to traditional Timber formwork.
What type of structures is this system best suited for?
It is specifically designed for flatslab or beam-less concrete structures where efficiency and speed are paramount.
How many workers are needed for installation?
Only a small team of 3-4 people is required to handle the installation, stripping, and removal processes.
Is the system safe for construction workers?
Yes, it features a six-directional locking mechanism and is designed to prevent lifting above shoulder height, minimizing injury risks.
Can I customize the color of the formwork?
Yes, while the standard color is Green, it can be customized according to your project requirements.
Does the system allow for early stripping?
Yes, the advanced drop-head mechanism is specifically designed for early stripping operations to accelerate construction cycles.

Related Products