Bamboo Plywood Peri Dock for Green and Resilient Building Solutions

Customization: Available
After-sales Service: Quality Warranty
Warranty: One Year

Product Description

Overview
Description
Installation
Company

Basic Specifications

Model NO.
GF-001
Certification
ISO, CE
Material
Steel
Type
Slab Formwork
Panel Material
High Tensile Steel Sheet
Plywood Material
Bamboo
Color
Green or Customized
Specification
1800x1200mm
Production Capacity
50000pcs/Year
Origin
China

Construction Material Green Formwork

The Ultimate Slab Formwork Solution for Flat Slab or Beam-less Structure Projects

Experience the evolving landscape of construction with our advanced aluminium/steel panel prop formwork system. It expertly facilitates early stripping operations, offering ideal formwork solutions tailored for flat slab or beam-less concrete structure projects.

Simple & Innovative: Minimal Components featuring Steel Frames and Bamboo Plywood Panels with Quick Release Mechanism. Eliminates cross braces and tripods.
Fast & Efficient: 3-4 workers for swift erection. Achieve an impressive 60-80m² per person daily.
Safe & Reliable: Rock-solid system with six-directional locking. Designed to avoid lifting above shoulder level.

Installation & Project Cases

Manufacturing Excellence

As a premier manufacturer and supplier of scaffolding and formwork systems, our state-of-the-art workshops host advanced lines for forging, casting, punching, welding, and surface treatment. Our couplers and clamps conform to BS1139 and EN74/EN74B standards.

Since 1993, we have been supplying global markets including Europe, USA, Canada, Brazil, Australia, and New Zealand. Our products are trusted across construction, power stations, and petrochemical industries.

Frequently Asked Questions

What are the main components of the Green Formwork system?
The system primarily consists of steel frames, bamboo plywood panels, and props with a specialized quick-release mechanism.
What makes this formwork safer than traditional methods?
It features a patented six-directional locking system and is designed to minimize the need for lifting materials above shoulder level during installation.
What is the expected installation efficiency?
A skilled team of 3-4 workers can achieve 60-80m² of formwork erection and stripping per person per day.
Does the system work for beam structures?
This specific system is optimized for flat slab or beam-less concrete structures to provide maximum efficiency and speed.
Are your products internationally certified?
Yes, our scaffolding and formwork systems conform to BS1139, EN74/EN74B, and hold official certifications from various international regions.

Related Products