📊 Overview & Basic Info
Type
Crawler Type Compost Turner
Function
Fertilizer Waste Fermentation
Raw Material
Organic Waste, Food Waste, Mushroom, Animal Manure
📦 Packaging & Delivery
Package Size
600.00cm * 800.00cm * 1000.00cm
⚙️ Product Description
The organic fertilizer horizontal fermentation tank controls the temperature between 65-75 ºC through ventilation, oxygenation, and stirring. When the high temperature is reached, it effectively eliminates pathogenic bacteria and parasites. Equipped with a deodorization system, it treats emitted gases with biological odor control, achieving harmless organic waste processing. The end product is ideal for soil improvement, landscaping, and landfill cover.
📋 Product Parameters
Low energy consumption: Energy conservation with high automation.
Fast fermentation: Completed within 7 days, unaffected by external temperature.
Wide applicability: Suitable for mixing powders and liquids.
Customized support: Available in 5-50M³ capacities (Horizontal/Vertical).
| Model |
Heating (kw) |
Stirring (kw) |
Reducer Model |
Speed (r/min) |
Dimensions (mm) |
| 15m³ |
30 |
22 |
ZQD850-291.19 |
3.4 |
6000*2600*2800 |
| 20m³ |
30 |
37 |
ZQD850-163.38 |
6 |
7400*2820*3260 |
Operation Principle: Materials are fed via belt conveyor. The motor reducer drives the main shaft for continuous stirring using spiral blades, ensuring full air contact for aerobic fermentation. The bottom electric heating system regulates thermal oil temperature via sensors to maintain the optimal environment for waste decomposition.
🔍 Detailed Photos
🛠️ Service & Support
Pre-sale Service
Technical & business consultation
Customized equipment schemes
Free CAD factory design
After-sales Service
On-site installation & debugging
Operator training
Life-long maintenance service
❓ Frequently Asked Questions
Are you a trading company or manufacturer?
We are a manufacturer with over 40 years of experience, providing one-stop service from design and manufacture to installation and technical training.
How long is the delivery time?
Standard components take 5-10 days. For customized non-standard machines, delivery is based on the specific project appointment time.
Do you arrange shipment for the equipment?
Yes. We handle shipment for FOB and CIF prices. For EXW terms, we provide full assistance in arranging the logistics.
How do you provide after-sales support?
We offer both video and written technical support. If required, our engineers are available for on-site service and maintenance.
What certifications do your products hold?
We are ISO 9001:2015 and SGS certified. We can also apply for other specific certificates based on customer requirements.
How is quality guaranteed before loading?
We have a dedicated QC department and a rigorous control system. All machines undergo 100% inspection and testing before delivery.